Skip to main content Skip to main navigation
heart-solid My Visit Donate
Home Smithsonian Institution IK development site for ODI
Press Enter to activate a submenu, down arrow to access the items and Escape to close the submenu.
    • Overview
    • Museums and Zoo
    • Entry and Guidelines
    • Museum Maps
    • Dine and Shop
    • Accessibility
    • Visiting with Kids
    • Group Visits
    • Overview
    • Exhibitions
    • Online Events
    • All Events
    • IMAX & Planetarium
    • Overview
    • Topics
    • Collections
    • Research Resources
    • Stories
    • Podcasts
    • Overview
    • For Caregivers
    • For Educators
    • For Students
    • For Academics
    • For Lifelong Learners
    • Overview
    • Become a Member
    • Renew Membership
    • Make a Gift
    • Volunteer
    • Overview
    • Our Organization
    • Our Leadership
    • Reports and Plans
    • Newsdesk
heart-solid My Visit Donate

Structural Panels, RCS Section, Gemini VI-A

Air and Space Museum

There are restrictions for re-using this image. For more information, visit the Smithsonian's Terms of Use page .
International media Interoperability Framework
IIIF provides researchers rich metadata and media viewing options for comparison of works across cultural heritage collections. Visit the IIIF page to learn more.
View manifest View in Mirador Viewer

    Object Details

    Summary

    These structural panels are from cylindrical Reaction Control System section of Gemini VI-A. Walter M. "Wally" Schirra commanded Gemini VI-A and Thomas P. "Tom" Stafford was the pilot. Gemini VI was originally scheduled to rendezvous and dock with an Agena target vehicle in October 1965, but after that vehicle was destroyed during launch, the mission was renumbered VI-A and changed to a rendezvous with Gemini VII. Gemini VI-A was launched on December 15, 1965, eleven days after Gemini VII, which acted as the rendezvous target. Three orbits after its launch, Gemini VI-A approached to within 6 inches of Gemini VII, the first rendezvous in space history. The Gemini VI-A flight lasted 26 hours and 16 orbits.
    The panels are likely parts flown on Gemini VI-A and replaced afterward during refurbishment for display. NASA transferred the spacecraft and components to the Smithsonian in 1968.

    Credit Line

    Transferred from the National Aeronautics and Space Administration

    Inventory Number

    A19680266001

    Restrictions & Rights

    Usage conditions apply

    Type

    SPACECRAFT-Crewed-Parts & Structural Components

    Materials

    Non-Magnetic White Metals (Including Possible Aluminum Alloy)
    Uncharacterized Coating
    Inks
    Wax
    Composite Wood

    Dimensions

    3-D (Larger Panels, Average): 48.3 × 36.5 × 2.5cm (1 ft. 7 in. × 1 ft. 2 3/8 in. × 1 in.)

    Country of Origin

    United States of America

    See more items in

    National Air and Space Museum Collection

    Data Source

    National Air and Space Museum

    Metadata Usage

    Not determined

    Link to Original Record

    http://n2t.net/ark:/65665/nv98c99bc5b-5165-471d-a5f1-0d699bace224

    Record ID

    nasm_A19680266001

    Discover More

    Space Shuttle orbiter Discovery on display in the McDonnell Space Hangar at the Steven F. Udvar-Hazy Center

    Human Spaceflight

    Space Shuttle orbiter Discovery on display in the McDonnell Space Hangar at the Steven F. Udvar-Hazy Center

    Human Spaceflight

    arrow-up Back to top
    Home
    • Facebook facebook
    • Instagram instagram
    • LinkedIn linkedin
    • YouTube youtube

    • Contact Us
    • Get Involved
    • Shop Online
    • Job Opportunities
    • Equal Opportunity
    • Inspector General
    • Records Requests
    • Accessibility
    • Host Your Event
    • Press Room
    • Privacy
    • Terms of Use